Hyperpoint

Insights

Notes from beyond the ERP.

What Hyperpoint publishes about enterprise AI, SAP and the work that happens between systems. Every number traced to its source.

Our LinkedIn series currently runs in Portuguese, for the Brazilian market. English pieces will be listed here as they are published.

  • Article · 7 minAI for SAP ECC: the decision map

    AI for SAP ECC: the decision map

    2027 is a decision date, not a migration date. What changed in 2026, the three real paths for ECC teams, and what decides whether AI on ECC survives the move to S/4.

    Also on LinkedIn, in English
  • Barreiras à adoção de agentes: 46% integração com sistemas existentes, 42% acesso e qualidade dos dados, 39% gestão da mudança. Fonte: Anthropic e Material, 2026.

    The 171% ROI isn't in the report. What is there is more useful

    A viral stat claimed 171% ROI from AI agents "according to Anthropic". We read the original report: the number isn't there. The top barriers aren't the model: integration (46%), data (42%), change management (39%).

  • 31/12/2027: fim da manutenção padrão do SAP ECC. Linha do tempo: hoje, 2027 e 2030 (fim da manutenção estendida). Fonte: SAP, 2020.

    ECC 2027 is a decision deadline, not a migration deadline

    End of 2027 closes SAP ECC mainstream maintenance. Many companies read it as a migration deadline; it is a decision deadline, and AI does not have to wait while the decision matures.

  • Pessoa de costas diante de uma parede de monitores numa sala de operações. Título: Seus sistemas estão maduros. Por que a investigação ainda é manual?

    Your systems are mature. Why is the investigation still manual?

    When something doesn't close, the scene repeats: three systems, a spreadsheet, a phone call to another team. It isn't an ERP failure. The ERP just doesn't carry the rest of the story.

  • Guindaste sobre um prédio em construção, contra o céu azul.

    Your AI strategy shouldn't wait for your SAP migration

    In many SAP teams the conversation ends the same way: "we'll look at AI after S/4". Migration and AI run on different timelines. Modernize both without building twice.

  • Grãos caindo do tubo de descarga para dentro de uma carreta, contra o céu azul.

    The truck arrived. Why hasn't the operation closed?

    The truck arrived, the scale weighed it, the lab graded it, the ERP received it. The load is still stuck: each system knows one part of the story.